Leites Machinery

Solution

Rationalizing The Earth’s Resources: Your Road to Riches!

180-250 tons/hour limestone mobile crushing station
Posted on 2024-09-23

This project is a surface stone processing project of a cement mine.

Project profile

Raw material: Limestone

Capacity: 180-250t/h

Output size: 0-10-20-30mm

Application: Finished material of mixing station

Main equipment: 750 mobile crushing station, 1315 mobile crushing station

Process flow

The material is uniformly transported by the slat feeder to the PE jaw crusher (which can pre-screen the soil), then to the vibrating screen for screening, and under the action of the belt to the impact crusher (first screening, then crushing). The material is then screened again until a qualified product (0-5-20-30mm) is produced.

equipment

750 mobile crushing station, 1315 mobile crushing station

advantage

➤1. Reasonable design and low investment cost

Reasonable design can not only reduce the use of silos and belts and construction costs, but also greatly shorten the installation period and reduce the failure rate.

➤2. High efficiency

The PE jaw crusher is equipped with higher efficiency and lower energy consumption than the traditional crusher. The feeder can effectively achieve soil separation. All of this has greatly increased productivity.

➤3. Short construction period

The operation does not require concrete foundations and multiple hoppers, which can avoid demolition and construction after the completion of the project, and is ideal for highway and high-speed rail construction where the flexibility of the crushing station is strict.

LEAVE A MESSAGE

Fill your requirements here, and we'll send the custmized solution and quotation to you by the reserved contact information.







    Related solutions

     
    vr
    Whatsapp
    +8615713843888
    Wechat
    +8615713843888